quote:Originally posted by Scrooge
However I have not been able to find a firm time table for how long the fix takes to install, I have heard around 1-3 months,
Erm, fix identified apparently, options on how to do it to be decided by end-September or earlier, then no news on how long it will take to actually do it.
1 - 3 months, exceedingly optimistic. 6 - 12 months more likely till first flight.
People are rumouring that the 747-8 could fly first as that's now in final assembly and doesn't have to go through the same certification as the 787.
There's a plane at JFK, to fly you back from far away
all those dark and frantic transatlantic miles